Pre-Production
On the 26th January i pitched my idea for my documentary to my group. I explained that I am going to be doing my documentary on events that occur on the market square, I am concentrating on the German Market, the big wheel and the outdoor ice rink. I started thinking about all this on 10th December.
The week commencing Tuesday the 20th January, I went to the Market Square to produce a recce report to see were the best possible shots were when filming. Also, to see important information such as transport, camera/sound, food and lighting issues.
I also constructed a risk assessment on potential hazards around the Market Square. This prevented me from damaging expensive equipment and myself.
The 2nd march I produce a shooting script with laid out step by step what was happening in my documentary. Such as the Narration, Visual and sound. I produced story boards as well to show the different shots I was going to include in my documentary. I constructed a production schedule to show the pacific dates and time im going to be working on this documentary
Production
On the 24th February I began shooting on my documentary. The shooting period lasted for about three weeks were i managed to get different shots types of the market square. These were shots such as time lapse, LS, MS and CU. Also, I managed to get interviews to improve my documentary.
Post-Production
The beginning of my documentary started with a time lapse of the whole market square which went into interviews. Because I couldn’t get any footage of the Outdoor ice rink and the German market, I had to use pictures. This was still effective but it would have been much better with actual footage.
Using Soundtrack Pro i created my own music that went with my documentary. The music was a guitar and reggae beat. I think the music went really well and just finished of my documentary